Project Scope
New 4-lane divided highway from Interstate
275 at Roosevelt Boulevard to 31st Court North.
Project Description
New 4-lane divided highway from Interstate
275 at Roosevelt Boulevard (SR 686) westward and parallel
to 118th Avenue North, to a temporary terminus at 31st
Court North. It will provide connection to both northbound
and southbound I-275. Other phases (segments) will continue
the alignment westward and parallel to 118th Avenue
near 43rd Avenue, then northward to link up with Roosevelt
Boulevard at Ulmerton Road (SR 688) near the St. Petersburg/Clearwater
Airport.
Proposed Limits:
I-275 westward to 31st Court North.
Other Project Statistics:
- Typical Section: 4-lane divided highway
- Partial Interchanges with I-275 and 31st Court North.
- Project Length: 1.0 miles
Project Schedule:
Construction is nearing completion.
C.R. 296 Connector - Phase 2
Financial Project ID: 256994-1-32-01
Project Scope
New 4-lane divided highway from 31st
Court North westward to near 43rd Street.
Project Description
New 4-lane divided highway parallel
to 118th Avenue North from 31st Court North westward
to near 43rd Street. Other phases (segments) will continue
the alignment northward to link up with Roosevelt Boulevard
(SR 686) at Ulmerton Road (SR 688) near the St. Petersburg-Clearwater
Airport, and provide a new westbound CR 296 Ramp from
I-275 Northbound at Roosevelt Boulevard.
Proposed Limits:
31st Court North westward to near 43rd
Street.
Other Project Statistics:
- Typical Section: 4-lane divided highway
- Partial Interchanges with 118th Avenue between 34th
Street and 43rd Street
- Project Length: 0.9 miles
Project Schedule:
Began Design: Summer 2001
Begin Right of Way Acquisition: Fiscal Year 2002/03
Begin Construction: Fiscal Year 2006/07
C.R. 296 Connector - Phase 3
Financial Project ID: 256998-1-32-01
Project Scope
Complete interchange between new CR
296 corridor, I-275 and Roosevelt Boulevard.
Project Description
Complete interchange between new CR
296 corridor, Interstate 275 and Roosevelt Boulevard
(SR 686). Other phases (segments) will continue the
new roadway north of 118th Avenue near 43rd Avenue to
link up with Roosevelt Boulevard at Ulmerton Road (SR
688) near the St. Petersburg Clearwater Airport.
Project Schedule:
Began Design: Summer 2001
Begin Right of Way Acquisition: Fiscal Year 2004/05
Begin Construction: Not Scheduled
C.R. 296 Connector - Phase 4
Financial Project ID: 256995-1-32-01
Project Scope
New Roadway extending Roosevelt Boulevard
south of Ulmerton Road to 118th Avenue North.
Project Description
Extension of Roosevelt Boulevard (SR686)
south of Ulmerton Road (SR 688) near the St. Petersburg-Clearwater
Airport, southward to 118th Avenue North. This phase
also includes the associated widening of Ulmerton Road
from 49th Street to 38th Street. Other phases (segments)
will widen existing Roosevelt Boulevard between 49th
Street and Ulmerton Road, and add a southbound "flyover"
exit ramp from the Bayside Bridge to Roosevelt Boulevard.
Proposed Limits:
Roosevelt Boulevard at Ulmerton Road
to 118th Avenue North.
Other Project Statistics:
- Extension Typical Section: 4-lane divided highway
- Two-lane, two-way frontage road on east side
- Interchanges with Ulmerton Road and 118th Avenue
North/43rd Street
- Ulmerton Road portion will be widened to a 6-lane
divided highway plus a continuous right turn lane
along portions of both sides.
- Project Length (along extension) 1.3 miles
Project Schedule:
Began Design: Fall 2001
Begin Right of Way Acquisition: Not Scheduled
Begin Construction: Not Scheduled
C.R. 296 Connector - Phase 5
Financial Project ID: 256997-1-32-01
Project Scope
Widen existing Roosevelt Boulevard
from 49th Street/Bayside Bridge to Ulmerton Road.
Project Description
Widen existing Roosevelt Boulevard
(SR 686) between 49th Street/Bayside Bridge and Ulmerton
Road (SR 688) to a 6-lane divided highway with a three-lane
one-way frontage road on each side, subject to coordination
with the upcoming St. Petersburg-Clearwater Airport
Master Plan Update by the Airport Authority. A future
phase will add a southbound "fly-over" exit
ramp from the Bayside Bridge to Roosevelt Boulevard.
Proposed Limits:
49th Street/Bayside Bridge southward
to Ulmerton Road.
Other Project Statistics:
- Typical Section: 6-lane divided highway (PD&E
Concept)
- Three-lane, one-way frontage road on both sides
(PD&E Concept)
- Project Length: 1.0 miles
Project Schedule:
Began Design: Not Scheduled
Begin Right of Way Acquisition: Not Scheduled
Begin Construction: Not Scheduled
C.R. 296 Connector - Phase 6
Financial Project ID: 256996-1-32-01
Project Scope
Add a southbound "flyover"
exit ramp from the Bayside Bridge to Roosevelt Boulevard.
Project Schedule:
Began Design: Fiscal Year 2003/04
Begin Right of Way Acquisition: Not Scheduled
Begin Construction: Not Scheduled
Contacts:
Tim Drawhorn, P.E.
FDOT Interstate Program Manager
Florida Department of Transportation
11201 North McKinley Drive, M.S. 7-600
Tampa, Florida 33612-6456
(813) 975-6163
timothy.drawhorn@dot.state.fl.us Marian Scorza
Public Information Officer
11201 North McKinley Drive, M.S. 7-100
Tampa, Florida 33612-6403
1(800) 226-7220 or (813) 975-6038
marian.scorza@dot.state.fl.us
|